Sanitary Sewer Management Plan (SSMP)

South Placer MUD Sanitary Sewer Management Plan (SSMP)  - 2015

The District is required to develop and implement a sewer system management plan (SSMP) under the State Water Resources Control Board WDR permit (Order 2006-0003-DWQ). The SSMP documents SPMUD’s program to properly operate and maintain the sanitary sewer system.

The SSMP addresses the following elements:

  1. Goal
  2. Organization
  3. Legal Authority
  4. Operation and Maintenance Program
  5. Design and Performance Provisions
  6. Overflow Emergency Response Plan
  7. Fats, Oils, and Grease (FOG) Control Program
  8. System Evaluation and Capacity Assurance Plan
  9. Monitoring, Measurement, and Program Modifications
  10. SSMP Program Audits
  11. Communication Program

As required, SPMUD performs an audit of the program every two years and it is updated and re-certified by the Board of Directors every five (5) years

Link to the California Integrated Water Quality System (CIWQS) Sanitary Sewer Overflow (SSO) Map.